Multi-phase temporary signals
Portable signal schemes for two, three and four-way phasing, with detection, timings and staging that keep traffic moving through the works.
Traffic Management CAD & Planning
Chapter 8 and TSRGD-compliant CAD drawings for closures, phased signals and events, delivered in 24 hours, nationwide.
What we draw
Portable signal schemes for two, three and four-way phasing, with detection, timings and staging that keep traffic moving through the works.
Full and rolling closures with signed diversion routes drawn to Chapter 8.
Protected walkways, crossings and segregation that keep the public safe on site.
Access, cordons and stewarding plans for festivals, races and civic events, coordinated with the local authority from first submission.
Most drawings back within 24 hours.
Tender deadlines, permit windows and start dates hold, because the plans are never the thing you are waiting on.
Drawn to scale from current site data.
Real measurements, correct signage and honest sightlines, so what is on the paper is what works on the ground.
Chapter 8 and TSRGD as the baseline.
Compliance is built in from the first line, which is why councils sign the drawings off the first time they see them.
Selected work
Multi-phase traffic lights & pedestrian crossingsStaged temporary signals with dedicated pedestrian crossing phases and a signed diversion route for resurfacing works on a residential road.
Multi-phase traffic lights & pedestrian crossingsThree-phase signal layout with footway closures, advance warning signage, and a temporary pedestrian route around a carriageway resurfacing scheme.
Pedestrian safety managementTemporary footpath diversions, crossing points, and clear signage ensuring safe pedestrian access throughout construction works.
Road closure & diversionComplete road closure plan with strategic diversion routing, advance warning signage placement, and coordinated traffic management for major highway works.
Multi-phase traffic lights with parking restrictionsThree-way traffic management plan with parking suspensions, a wide shuttle lane, and phased signals to keep traffic moving through the works.
Road closure & diversionFull closure scheme with signed diversion routes, advance warning boards, and maintained pedestrian access throughout the works period.
Location, phasing, dates and any survey or plans you have. A photo and a postcode is often enough to start.
Your scheme is produced as a full CAD drawing, correct to Chapter 8 and TSRGD from the first line.
You review the draft and we adjust phasing, signage or routing until it fits the job exactly.
You receive a submission-ready drawing, formatted for the authority and built to be approved first time.
In a high-stakes industry, a rejected drawing is a stalled site. We build every plan to the standards authorities check against, so approval is the expected outcome.
Temporary traffic management drawn to the Traffic Signs Manual, Chapter 8.
Signs and markings correct to the current regulations, every plan.
Trained and accredited to recognised UK industry standards.
A decade of schemes that pass on first submission, nationwide.
Send the scheme and we'll come back with a quote and a turnaround, usually the same day.
Call the studio+44 7402 590790 navistmplanning@gmail.com