Skip to content

Traffic Management CAD & Planning

Council-ready traffic plans, approved the first time.

Chapter 8 and TSRGD-compliant CAD drawings for closures, phased signals and events, delivered in 24 hours, nationwide.

24h
Standard drawing turnaround
10+ yrs
In UK traffic management
First time
Approval rate we design for
Nationwide
Councils and contractors served

What we draw

Every scheme a highways team will wave through.

01

Multi-phase temporary signals

Portable signal schemes for two, three and four-way phasing, with detection, timings and staging that keep traffic moving through the works.

PhasingDetectionStaging
02

Road closures & diversions

Full and rolling closures with signed diversion routes drawn to Chapter 8.

Signed routes
03

Pedestrian safety schemes

Protected walkways, crossings and segregation that keep the public safe on site.

Walkways
04

Event traffic management

Access, cordons and stewarding plans for festivals, races and civic events, coordinated with the local authority from first submission.

CordonsAccessStewarding

Three promises the whole studio is built around.

01

Fast

Most drawings back within 24 hours.

Tender deadlines, permit windows and start dates hold, because the plans are never the thing you are waiting on.

02

Accurate

Drawn to scale from current site data.

Real measurements, correct signage and honest sightlines, so what is on the paper is what works on the ground.

03

Compliant

Chapter 8 and TSRGD as the baseline.

Compliance is built in from the first line, which is why councils sign the drawings off the first time they see them.

Selected work

Live schemes, drawn and signed off across the UK.

Multi-phase traffic lights & pedestrian crossings traffic management plan
Multi-phase traffic lights & pedestrian crossings

The Slade, Glyndon, SE18 2NE

Staged temporary signals with dedicated pedestrian crossing phases and a signed diversion route for resurfacing works on a residential road.

Multi-phase traffic lights & pedestrian crossings traffic management plan
Multi-phase traffic lights & pedestrian crossings

Daiglen Drive, Thurrock, RM15 5RQ

Three-phase signal layout with footway closures, advance warning signage, and a temporary pedestrian route around a carriageway resurfacing scheme.

Pedestrian safety management traffic management plan
Pedestrian safety management

Castlehaven Road, London, NW1 8RA

Temporary footpath diversions, crossing points, and clear signage ensuring safe pedestrian access throughout construction works.

Road closure & diversion traffic management plan
Road closure & diversion

Queen Adelaide Way, Ely, Cambridgeshire, CB7 4TZ

Complete road closure plan with strategic diversion routing, advance warning signage placement, and coordinated traffic management for major highway works.

Multi-phase traffic lights with parking restrictions traffic management plan
Multi-phase traffic lights with parking restrictions

Epping Road, Ongar, Epping Forest, Essex, CM5 0NA

Three-way traffic management plan with parking suspensions, a wide shuttle lane, and phased signals to keep traffic moving through the works.

Road closure & diversion traffic management plan
Road closure & diversion

Crawley Road, Cranfield, Bedford, MK43 0AA

Full closure scheme with signed diversion routes, advance warning boards, and maintained pedestrian access throughout the works period.

From a postcode to an approved drawing, in four moves.

  1. 01 / Send

    Send us the site

    Location, phasing, dates and any survey or plans you have. A photo and a postcode is often enough to start.

    01
  2. 02 / Draw

    We draw it to scale

    Your scheme is produced as a full CAD drawing, correct to Chapter 8 and TSRGD from the first line.

    02
  3. 03 / Refine

    Review and refine

    You review the draft and we adjust phasing, signage or routing until it fits the job exactly.

    03
  4. 04 / Deliver

    Council-ready pack

    You receive a submission-ready drawing, formatted for the authority and built to be approved first time.

    04

Compliance is the whole point, not the fine print.

In a high-stakes industry, a rejected drawing is a stalled site. We build every plan to the standards authorities check against, so approval is the expected outcome.

Chapter 8

Temporary traffic management drawn to the Traffic Signs Manual, Chapter 8.

TSRGD 2016

Signs and markings correct to the current regulations, every plan.

Lantra accredited

Trained and accredited to recognised UK industry standards.

10+ years

A decade of schemes that pass on first submission, nationwide.

Let's get your drawings approved.

Send the scheme and we'll come back with a quote and a turnaround, usually the same day.

Call the studio+44 7402 590790 navistmplanning@gmail.com
  • Reply within one working hour
  • 24-hour drawing turnaround
  • No-obligation quote

We will respond to your message within 24 hours. Or call +44 7402 590790.